Allanaquoich Bridge Replacement

Allanquoch bridge replacement completed following damage from Storm "Frankā€ in 2016

The £300k replacement of the bridge across the River Quoich (to the north of the River Dee) has been completed.

Allen Gordon undertook the overall design, which incorporated a preformed system from Beaver Bridges, as well as managing the tender and administering the construction on behalf of the National Trust for Scotland.

The bridge forms part of a core path network and long established bridleway and was considered a high priority following the devastation of the storm.

Location:
Mar Lodge Estate
Started on:
November 2019
Completed on:
November 2020